Service
Shipping container recycling, from port to certificate.
We take end-of-life containers off your hands in Panamá and give you documented proof that each one was recycled.
Who it's for
For the companies that own and move containers.
Damaged, end-of-life or off-hire: if a container will not sail again, repositioning it costs money and leaving it in a yard costs space. We retire it in Panamá.
Shipping lines
Retire damaged or end-of-life units in Panamá without repositioning them.
Container lessors
Close out off-hire units with documented proof for your fleet records.
Depots and terminals
Clear space taken up by units that will never sail again.
Forwarders and owners
Whether you own the container or move it, we handle its retirement.
The process
Five steps. All on record.
Send your list
Share the container numbers and the period they are available for collection.
Port pickup
We request the port permit at least 24 hours ahead, register driver, vehicle and time, and collect each container.
First cut
The first cut is photographed with the container number visible, stamped with time and stage.
Recycled
The container is fully cut down and the steel goes back into the steel recycling stream.
Certificate
You receive a certificate of recycling per container, with a unique number and QR code.
What you receive
Documents for every single container.
Work order
Every container gets its own work order with a QR code that links to its record.
Photo evidence
The first cut is photographed with the container number visible, stamped with time and stage.
Certificate of recycling
A certificate per container, with a unique number and QR code for public verification.
Batch overview
Status of every container in your batch, with an export for your own records.
Port pickups
We handle the port permits.
Collecting a container from a terminal in Panamá needs a permit requested at least 24 hours in advance, with the driver, vehicle and time registered. Once you share your container list and the collection window, we plan the pickups and request the permits.
Our drivers carry a digital gate pass with a QR code, and each container is registered when it is picked up, so you can follow it from the terminal gate to the final cut.
The steel
What happens to the steel.
Shipping containers are built mostly from Corten weathering steel. After cutting, the steel goes back into the steel recycling stream. Steel can be recycled indefinitely without losing quality, which makes a retired container a valuable raw material rather than waste.
Questions
Common questions about the service
Which ports do you collect from?
We work with container terminals in Panamá on both the Pacific and Atlantic sides, as well as inland depots and yards. Tell us the terminal or location and we arrange the pickup.
How far ahead do I need to plan a port pickup?
Port pickups require a permit requested at least 24 hours in advance, with the driver, vehicle and time registered. We handle the request for you once you share the container list.
What evidence do I receive?
Each container gets a work order and is registered at pickup. The first cut is photographed with the container number visible, stamped with the time and stage. Every step is kept in a tamper-evident record linked to the certificate.
What happens to the steel?
Shipping containers are built mostly from Corten weathering steel. After cutting, the steel goes back into the steel recycling stream, where it can be melted into new steel without loss of quality.
How many containers do you need to retire?
Tell us the volume and the location. We reply with a plan and a price.